Operations; Power Up The Server; Power Down The Server; Extend The Server From The Rack - HP ProLiant DL380 G6 User Manual

Hide thumbs Also See for ProLiant DL380 G6:
Table of Contents

Advertisement

Operations

Power up the server

To power up the server, press the Power On/Standby button.

Power down the server

WARNING:
remove the power cord to remove power from the server. The front panel Power On/Standby
button does not completely shut off system power. Portions of the power supply and some internal
circuitry remain active until AC power is removed.
IMPORTANT:
Back up the server data.
1.
Shut down the operating system as directed by the operating system documentation.
2.
NOTE:
step.
Press the Power On/Standby button to place the server in Standby mode. When the server activates
3.
Standby power mode, the system power LED changes to amber.
IMPORTANT:
In a rack environment, this feature facilitates locating a server when moving between the front and
rear of the rack.
Disconnect the power cords.
4.
The system is now without power.

Extend the server from the rack

Pull down the quick release levers on each side of the server.
1.
Extend the server from the rack.
2.
WARNING:
adequately stabilized before extending a component from the rack.
To reduce the risk of personal injury, electric shock, or damage to the equipment,
If installing a hot-plug device, it is not necessary to power down the server.
If the operating system automatically places the server in Standby mode, omit the next
Pressing the UID button illuminates the blue UID LEDs on the front and rear panels.
To reduce the risk of personal injury or equipment damage, be sure that the rack is
Operations 22

Advertisement

Table of Contents
loading

Table of Contents