Steps For Finalizing The Installation - Lopi Cypress GSR Owner's Manual

Direct vent freestanding stove natural gas or propane
Table of Contents

Advertisement

Installation

Steps for Finalizing the Installation

1.
Remove the glass (see page 23).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs, driftwood, or stone
set.
2.
We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
3.
Make sure the accent light works correctly.
NOTE: Take care to not touch the bulb with your fingers – use a cloth or paper towel).
4.
Install the four AA batteries (see illustration below). The AA batteries act as a power backup in case the
household (AC) power goes out and are required for operation.
illustration below). Synchronize the transmitter to the IFC (see page 26).
5.
Install the media (logs, driftwood, or stone set - see page 25).
6.
Replace the glass.
7.
Start the heater.
8.
Leak test all gas joints.
© Travis Industries
(for qualified installers only)
Install three AAA batteries into the remote (see
4121109
21
100-01329.docx

Advertisement

Table of Contents
loading

Table of Contents