Check Safety Controls - Bryant 355BAV Installation, Start-Up, And Operating Instructions Manual

Direct-vent upflow variable-capacity condensing gas furnace
Hide thumbs Also See for 355BAV:
Table of Contents

Advertisement

SECONDS
FOR 1
REVOLUTION
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
Set Thermostat Heat Anticipator
When using a non- -electronic thermostat, the thermostat heat
anticipator must be set to match the amp draw of components in
the R- -W/W1 circuit. Accurate amp draw measurements can be
obtained only at the thermostat subbase terminals R and W.
The thermostat and anticipator should NOT be in the circuit while
measuring current. If thermostat has no subbase, the thermostat
must be disconnected from R and W/W1 wires during current
measurement.
Fig. 54 illustrates an easy method of obtaining thermostat amp
draw measurements. The amp reading should be taken after blower
motor has started and furnace is operating in low- -heat.
1. To operate furnace in low- -heat, turn setup switch SW1- -2 to
ON position (See Fig. 33) and connect ammeter leads across
thermostat subbase R- -W.
2. See thermostat manufacturer's instructions for adjusting the
heat anticipator and for varying heating cycle length.
NOTE: When using an electronic thermostat, set cycle rate for 3
cycles per hr.
3. Return setup switch SW1- -2 to OFF position and replace
thermostat on subbase.

Check Safety Controls

This section covers the safety controls that must be checked before
the installation is complete. The flame sensor, gas valve, and
pressure switches were all checked in the Start- -up procedure
section as part of normal operation.
Table 13 – Gas Rate Cu Ft/Hr
SIZE OF TEST DIAL
1
2
5
cu ft
cu ft
cu ft
360
720
1800
327
655
1636
300
600
1500
277
555
1385
257
514
1286
240
480
1200
225
450
1125
212
424
1059
200
400
1000
189
379
947
180
360
900
171
343
857
164
327
818
157
313
783
150
300
750
144
288
720
138
277
692
133
267
667
129
257
643
124
248
621
120
240
600
116
232
581
113
225
563
109
218
545
106
212
529
103
206
514
100
200
500
97
195
486
95
189
474
92
185
462
90
180
450
88
176
439
86
172
429
84
167
419
82
164
409
80
160
400
78
157
391
76
153
383
75
150
375
73
147
367
SECONDS
FOR 1
REVOLUTION
50
51
52
53
54
55
56
57
58
59
60
62
64
66
68
70
72
74
76
78
80
82
84
86
88
90
92
94
96
98
100
102
104
106
108
110
112
116
120
Check Primary Limit Control
This control shuts off the gas control system and energizes the
air- -circulating blower motor if furnace overheats.
1. The recommended method of checking this limit control is
to gradually block off return air after furnace has been oper-
ating for a period of at least 5 minutes.
2. As soon as limit control has shut off burners, a status code
33 will appear on furnace control.
3. The return- -air opening should be unblocked to permit nor-
mal air circulation.
By using this method to check the limit control, it can be
established that the limit is functioning properly and the furnace
will operate safely if there is a restricted return- -air duct or motor
failure. If the limit control does not function during this test, the
cause must be determined and corrected.
Check Pressure Switches
This control proves operation of the draft inducer. Check switch
operation as follows:
1. Turn off 115- -v power to furnace.
2. Remove control access door and disconnect inducer motor
12- -pin wire harness at inducer motor.
3. Turn on 115- -v power to furnace.
49
SIZE OF TEST DIAL
1
2
5
cu ft
cu ft
cu ft
72
144
360
71
141
355
69
138
346
68
136
340
67
133
333
65
131
327
64
129
321
63
126
316
62
124
310
61
122
305
60
120
300
58
116
290
56
112
281
54
109
273
53
106
265
51
103
257
50
100
250
48
97
243
47
95
237
46
92
231
45
90
225
44
88
220
43
86
214
42
84
209
41
82
205
40
80
200
39
78
196
38
76
192
38
75
188
37
74
184
36
72
180
35
71
178
35
69
173
34
68
170
33
67
167
33
65
164
32
64
161
31
62
155
30
60
150

Advertisement

Table of Contents
loading

Table of Contents