1. Put away tools and instruments. Clean up debris.
2. Check SW-1 through SW-3 after completing installation to
ensure desired settings for thermostat type (SW-1) and
blower-OFF delay (SW-2 and SW-3).
3. Verify flame rollout manual reset switch has continuity.
4. Verify that blower and outer doors are properly installed.
CHECKLIST—DIRECT VENT (2-PIPE) INSTALLATION
LOAD CALCULATION
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
COMBUSTION AIR AND VENT PIPING
Termination Location
____________
Roof or Sidewall
____________
Termination Kit --- 2 Pipe or Concentric
____________
Combustion-Air Pipe Length
____________
Combustion-Air Pipe Elbow Quantity
____________
Vent Pipe Length
____________
Vent Pipe Elbow Quantity
____________
Pipe Diameter Determined from Sizing Table
____________
Pipe Sloped To Furnace
Pipe Insulation
____________
Over Ceilings ________
____________
Low-Ambient Exposed Pipes

CHECKLIST

5. Cycle test furnace with room thermostat.
6. Check operation of accessories per manufacturer's
instructions.
7. Review User's Guide with owner.
8. Leave literature packet near furnace.
Condensate Drain
____________
____________
____________
____________
____________
CHECKLIST - - START-UP
____________
____________
Thermostat Anticipator
____________
____________
Safety Controls Check Operation
____________
____________
61
Unit Level or Pitched Forward
Internal Tubing Connections Free of
Kinks and Traps
External Drain Connection
Leak Tight and Sloped
Condensate Trap Primed before Start-Up
Heat Tape Installed if Required
Gas Input Rate
(Set Within 2 percent of Rating Plate)
Temperature Rise Adjusted
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr) Selected
Primary Limit
Pressure Switch

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents