Vent Termination - Bryant 352AAV Installation, Start-Up, And Operating Instructions Manual

Deluxe 4-way multipoise 2-stage condensing gas furnace
Table of Contents

Advertisement

VENT PIPE
HORIZONTAL TO ROOF
COMBUSTION-AIR PIPE
VERTICAL TO ROOF

VENT TERMINATION

General
Combustion-air (direct vent/2-pipe system only) and vent pipe
must terminate outside structure, either through sidewall or roof.
For vent termination clearance, refer to Table 8 for Direct
Vent/2-Pipe system and Table 9 for Non-direct Vent/1-Pipe
system.
For
exterior
piping
Fig. 44 for Direct
Vent/2-Pipe
Non-Direct/1-Pipe system.
Roof termination is preferred since it is less susceptible to
damage or contamination, and it has less visible vent vapors.
Sidewall termination require sealing or shielding of building
surfaces with a corrosive resistance material due to corrosive
combustion products of vent system.
NOTE: (Direct Vent/2-Pipe system ONLY). A factory accessory
termination kit MUST be used. See section "Vent Termination Kit
(Direct Vent/2-Pipe System Only)" in this instruction.
When determining appropriate location for termination, consider
the following guidelines:
1. Comply with all clearance requirements stated in Table 8
or Table 9 per application.
2. Termination or termination kit should be positioned where
vent vapors will not damage plants/shrubs or air
conditioning equipment.
3. Termination or termination kit should be positioned so that
it will not be affected by wind eddy, such as inside
12 " MIN
(305mm)
COMBUSTION-AIR PIPE
12 " MIN
(304.8mm)
NOTE: A 12-in. (304.8mm) minimum offset pipe section is recommended
with short (5 to 8 ft / 1.5 to 2.5M) vent systems. This recommendation
is to reduce excessive condensate droplets.
Fig. 43 - - Short Vent (5 to 8 ft (1.5 to 2.4 M)) System
arrangements,
refer
to
system
and
Fig.
45
for
12 " MIN
(305mm)
VENT PIPE
HORIZONTAL TO SIDEWALL
COMBUSTION-AIR PIPE
VENT PIPE
VERTICAL TO SIDEWALL
building corners, nor by recirculation of flue gases,
airborne leaves, or light snow.
4. Termination or termination kit should be positioned where
it will not be damaged by or subjected to foreign objects
such as stones, balls, etc.
5. Termination or termination kit should be positioned where
vent vapors are not objectionable.
Extended Exposed Sidewall Pipes
Sidewall combustion air pipe termination (direct vent/2-pipe
system only) and vent pipe termination may be extended beyond
area shown in Fig. 44 or in Fig. 45 per application in outside
ambient by insulating pipe as indicated in Table 10.
1. Determine
combustion
vent/2-pipe system only) and vent pipe diameter, as stated
above, using total pipe length and number of elbows.
2. Using
winter
calculations), find appropriate temperature for your
application and furnace model.
3. Determine required insulation thickness for exposed pipe
length(s).
NOTE: Pipe length (ft) specified for maximum pipe lengths
located in unconditioned spaces cannot exceed total allowable
pipe length as specified in Table 13.
Vent Termination Kit (Direct Vent/2-Pipe System Only)
NOTE: Always refer to the instructions in termination kit for the
latest version.
43
COMBUSTION-AIR PIPE
12 " MIN
(304.8mm)
VENT PIPE
air
pipe
diameter
design
temperature
(used
A96230
(direct
in
load

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents