Performing Leak Tests; Connecting The Drain Hose To The Outdoor Unit; Insulation - Samsung UH070CAV1 Installation Manual

System air conditioner
Table of Contents

Advertisement

Performing leak tests

A
B

Connecting the drain hose to the outdoor unit

Insulation

No gap
0.511inch
NBR(T
or thicker)
16
E-

Advertisement

Table of Contents
loading

Table of Contents