Heat & Glo 6TRSI-AUD Owner's Manual page 70

Natural gas, propane or butane as a balanced flue heater
Hide thumbs Also See for 6TRSI-AUD:
Table of Contents

Advertisement

C. Vent Components Diagrams (continued)
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be
used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the
existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B
will be required.
15-1/8 in.
(384 mm)
(305 mm)
DVP-TRAP2
Horizontal Termination Cap
Figure 16.4 DVP vent components
70
8 in.
(203 mm)
12 in.
1 in.
(25 mm)
14 in.
(356 mm)
3/8 in. (10 mm)
Heat & Glo • 6TRSI-AUD, 6TRSILP-AUD • 2078-980 Rev. Q • 2/14
Heat
Shield
Term Cap
Trap2
Max
Effective
Length
DVP-TRAP2
7-1/4 in.
(184 mm)
1 in. (25 mm)
7-3/4 to 10-3/8 in.
(197 to 264 mm)
DVP-FBHT
FireBrickTermination Cap
Minimum
Maximum
Effective Length
Effective Length
5-3/8 in.
9-3/8 in.
137 mm
238 mm