Verify The Switch's Operation - HP J3245A Installation And Configuration Manual

Hewlett-packard advancestack switch installation and configuration guide
Table of Contents

Advertisement

Installation

2. Verify the Switch's Operation

2. Verify the Switch's Operation
This process verifies that the Switch 800T is operating properly.
Verify the Switch Hardware
1.
2.
N o t e
The Switch 800T does not have a power switch. It is powered on when the
switch's power cord is connected to the switch and to a power source.
If your installation requires a different power cord than the one supplied with
the switch, be sure to use a power cord displaying the mark of the safety
agency that defines the regulations for power cords in your country. The mark
is your assurance that the power cord can be used safely with the switch.
3.
1-6
Connect the supplied power cord to the switch's power receptacle.
Power Receptacle on
the Back of the Switch
Figure 1-4. Back Panel of the Switch 800T
Plug the power cord into a properly grounded electrical outlet.
Check the LEDs on the switch's front panel.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Advancestack 800t

Table of Contents