Task 8: Verify Switch-To-Hafm Server Communication; Switch Operational States And Symbols - HP StorageWorks edge switch 2/32 Installation Manual

Table of Contents

Advertisement

Installing and Configuring the Edge Switch 2/32

Task 8: Verify Switch-to-HAFM Server Communication

Communication must be verified between the switch and the HAFM server (High
Availability Fabric Manager and Product Manager applications). To verify
switch-to-server communication:
1. At the Windows 2000 desktop, click HAFM at the task bar (bottom of the
desktop) to maximize the Product View page.
2. At the Product View page, inspect the shape and color of the symbol behind the
Edge Switch 2/32 icon.
symbols.
Table 2–2: Switch Operational States and Symbols
Operational—switch-to server communication is established, the
switch is operational, and no failures are indicated. Go to
Set Switch Date and
Degraded—switch-to server communication is established, but the
switch is operating in degraded mode and requires service. This
condition is typical if a port or redundant FRU fails. Go to
Failed—switch-to server communication is established, but the
switch failed and requires immediate service. Go to
Status Unknown—the switch status is unknown because of a
network communication failure between the switch and
server. Go to
3. Double-click the switch icon. The Hardware View page for the selected switch
displays, as shown in
Flashing red and yellow diamonds, and switch degradation is indicated by the
yellow triangle at the alert panel.
2-14
All manuals and user guides at all-guides.com
Table 2–2
Operational State
Time" on page 2–21.
step
3.
Figure
2–8. In the example, FRU failures are indicated by
explains operational states and associated
"Task 11:
step
step
3.
HAFM
edge switch 2/32 installation guide
Symbol
3.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aa-rstzb-te/958-000290-000

Table of Contents