Junction Box Wiring - Empire Comfort Systems VFLL38FP30L-1 Installation Instructions And Owner's Manual

Contemporary linear vent-free fireplace
Table of Contents

Advertisement

CAUTION: ALL WIRING SHOULD BE DONE BY A qUALIFIED
ELECTRICIAN AND SHALL BE IN COMpLIANCE WITH ALL
LOCAL, CITy AND sTATE BUILDING CODEs. BEFORE MAK-
ING ThE ELECTRICAL CONNECTION, MAKE sURE ThAT
MAIN pOWER SUppLY IS DISCONNECTED. THE AppLIANCE,
WHEN INSTALLED, MUST BE ELECTRICALLY GROUNDED IN
ACCORDANCE WITH LOCAL CODES OR, IN THE ABSENCE
OF LOCAL CODES, WITH THE NATIONAL ELECTRICAL CODE
ANSI/NFpA 70 (LATEST EDITION).
A factory installed junction box is located at the lower right corner
inside the firebox bottom cavity. Wiring must be fed to the junction
box through the outer wrap of the fireplace, then connected as
required inside the junction box as directed below. Refer to the
instructions below to determine what wiring is needed depending
on what valve system you have, and whether or not the optional
Accent Light kit will be installed.
It is recommended that approximately 6" of wiring be left in the junc-
tion box to allow for connections. For wiring detail, refer to Figure 54.
29516-10-0713
JUNCTION BOX WIRING
Figure 54
INSTALLATION
120 Volt electrical requirements will depend on which model
fireplace is installed.
For VFLL38FP30L series millivolt operated system: Wiring is
only needed if adding the LK5 Accent Light accessory. Follow the
wiring instructions included with the LK5 to connect this optional
accessory through the junction box to a wall switch.
For VFLL38FP90L series "IP" operated system: The suggested
120 Volt electrical requirements include installation of the electrical
receptacle into the junction box located at the lower right corner
inside the firebox bottom cavity. This will be used to plug in the AC/
DC Adapter that provides power to the electronic valve system.
Note: If an LK5 Accent Light kit is to be installed, a separate 120
Volt line will be needed to connect the light kit wiring directly to a
wall switch.
1.
To access and install the junction box and wiring, begin by
removing the burner cover. Lift it straight up off of the burner
and set aside.
2.
Remove the three 5/16" Hex screws that hold down the complete
burner and valve assembly. There are two screws on the front
bottom flange, and one located on the back bottom flange, near
the right end. See Figure 55.
Figure 55
Page 39

Advertisement

Table of Contents
loading

Table of Contents