2-5Charging The Battery; 2-6Measuring The Initial Value Of Backup Time; 2-7Recharging The Battery - Omron POWLI BU3002SW Instruction Manual

Ups/200 to 240v
Hide thumbs Also See for POWLI BU3002SW:
Table of Contents

Advertisement

2-5 Charging the battery
When you connect the AC input plug of this unit to a wall outlet (commercial power), the battery charg-
ing automatically starts regardless of whether the power switch is ON or OFF, and it is fully charged
within 8 hours. (When an additional battery unit is connected, the charging time is 24 hours.)
● This unit has been charged prior to shipment. However, the backup time becomes shorter when using it for
the first time due to spontaneous discharge. We recommend charging this unit before using it.
● If you do not perform the initial backup time measurement described below in "2-6 Measuring the initial
value of backup time", proceed to "3. Operation". → Page 34
2-6 Measuring the initial value of backup time
● When you measure the backup time initial value of the unit in your environment, this value can be used as
a guide when checking the battery and deciding the UPS monitoring software setting values.
"5. Measuring the backup time" → Page 51
See also
2-7 Recharging the battery
The battery is discharged completely when the backup time is measured, so you need to recharge it before
using the UPS.
● You can use connected devices while recharging the battery, but the backup time when a power failure
occurs is shorter until the battery is fully charged.
(If a power failure occurs immediately after the start of charging, backup stops immediately.)
See also
Charge the battery as described in "2-5 Charging the battery."
Preparation for starting operation is now complete.
33
2. Installation and connection

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powli bu1002sw

Table of Contents