Completing The Installation; Cable Connection (Lc Shown) To Uplink Port With Sfp/Xfp Installed - Enterasys G3G124-24 Hardware Installation Manual

G-series
Hide thumbs Also See for G3G124-24:
Table of Contents

Advertisement

Completing the Installation

2.
Insert the cable connector into the 
Figure 2-11
1
Combo SFP port with MGBIC installed
3.
Plug the other end of the cable into the appropriate port on the other device. Some cables may 
be terminated at the other end with two separate connectors, one for each fiber‐optic strand. In 
this case, ensure that the transmit fiber‐optic strand from the G‐Series is connected to the 
receive port of the other device, and the receive fiber‐optic strand on the G‐Series is connected 
to the transmit port of the other device.
4.
Repeat this procedure for other SFP/XFP ports, if needed.
5.
If an SFP/XFP port is unused, install a dust cover.

Completing the Installation

1.
Power on the switch.
2.
Verify that the PWR1 and PWR2 power LEDs are lit. Refer to "Power LED Displays" on 
page 2‐14 for information on interpreting the power LEDs.
3.
Verify that the SYSTEM LED blinks initially then becomes solid green.
4.
Make sure that the network devices connected to the switch ports are powered on, then verify 
that each Link/Activity LED is ON (solid green or blinking green).
5.
At the device connected to the console port, perform the following:
a.
b. At the Password prompt, press ENTER (RETURN). 
2-22 Installation
Note: Leave the protective covers in place when the connectors are not in use to prevent
contamination.

Cable Connection (LC shown) to Uplink Port with SFP/XFP Installed

Enter admin for Username.
connector until it clicks into place.
SFP/XFP 
2 LC cable connector
3
Release tab

Advertisement

Table of Contents
loading

This manual is also suitable for:

G3g124p-24G3g170-24

Table of Contents