Preventive Maintenance (Pm); Maintenance Performed Every 81,000 (E-Studio160/200 Series) And 99,000 Copies (E-Studio250 Series); Preventive Maintenance Check List - Toshiba e-STUDIO160 Service Handbook

Digital multi function
Table of Contents

Advertisement

2. PREVENTIVE MAINTENANCE (PM)

2.1 Maintenance Performed Every 81,000 (e-STUDIO160/200 Series) and
99,000 Copies (e-STUDIO250 Series)
(1) Preparation
Ask user about the current machine condition and note them down.
Before starting maintenance, make some sample copies and save them.
Turn OFF the power, and be sure to unplug the copier.
(2) Perform preventive maintenance using the following checklist and the illustrations. Refer to the Ser-
vice Manual and Parts List if necessary.
(3) When the maintenance is finished, plug in the copier, turn ON the power, and make a few copies to
confirm that the copier is working properly.

2.2 Preventive Maintenance Check List

Cleaning
A
Cleaning with
GR
alcohol
Cleaning with
W
soft pad, cloth or
vacuum cleaner
FL
SI
AV
Notes: 1. Perform cleaning and apply lubrication every 81,000 copies for e-STUDIO160/200 series and
99,000 copies for e-STUDIO250 series.
2. <P-I> under "Remarks" indicates page and item number in the Parts List.
3. Replacement cycle of the parts of the feeding section depends on the number of papers fed
from each paper source.
4. Values under "Replacement" indicates the replacement cycle for the e-STUDIO160/200 series
e-STUDIO250 series.
5. Do not put oil on the rollers and belts when lubricating them.
6. Replace the parts with the life of 27,000 copies (e-STUDIO160/200 series) and 33,000 copies
(e-STUDIO250 series) listed in the check list.
7. Replace the heat roller (metallic gold or dark green) and PM kit (FU-KIT-1600N and FU-KIT-
2500N) at every 135,000 copies (e-STUDIO160/200 series) and 165,000 copies (e-STUDIO250
series).
December 2002 TOSHIBA TEC
Symbols used in the check list
Lubrication
GR Grease
27K Every 27,000 copies
(X5-6020)
33K Every 33,000 copies
White grease
81K Every 81,000 copies
(Molykote HP-300)
99K Every 99,000 copies
FL Floil (GE-334C)
135K Every 135,000 copies
Silicon oil
165K Every 165,000 copies
Alvania No. 2
Replace if deformed
or damaged
2 - 1
Replacing
Operation check
After cleaning or
replacing, check
for no abnormality
e-STUDIO160/200/250 PREVENTIVE MAINTENANCE
Date
User's name
Serial No.
Inspector's
name
Remarks

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-studio200E-studio250

Table of Contents