Plumbing Manifold - Worcester GREENSTAR 30CDi Installation, Commissioning And Servicing Instructions

Greenstar cdi classic regular wall hung rsf gas fired condensing regular boiler, for open vented and sealed central heating systems and indirect domestic hot water
Table of Contents

Advertisement

BATHROOMS:
Additional RCD (Residual Current Device) protection may be required.
Refer to the latest IEE wiring regulations.
NOTICE: Any switch or appliance control using 230 V
mains electricity must not be able to be touched by a
person using the bath or shower. Electrical switches,
fused spur and socket outlets must not be situated in
the bathroom.
BATHROOM INSTALLATIONS
Radius 600mm
Fig. 17 Bathroom installations
3.6

PLUMBING MANIFOLD

CONNECTIONS:
Heating System: 22mm compression fittings
Gas: 22mm compression fittings
Use the fittings supplied in the Hardware pack.
PREPLUMBING
With the plumbing manifold installed, pipe work can be installed to the
valves on the manifold.
RUNNING PIPES BEHIND THE BOILER
If the boiler pipes are to be run behind the appliance ensure that the
pipes pass close to the wall as shown in the diagram opposite, and within
the pipe guide.
6 720 806 548 (2013/02)
6720646608-124.3Wo
Fig. 18 Behind the boiler pipe run
Flow 22mm
Return 22mm
Mains Gas Supply 22mm
PRE-INSTALLATION
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 40cdiGreenstar 40cdi

Table of Contents