Framing And Clearances; Selecting Appliance Location - Heat & Glo SLR (Cosmo) Owner's Manual

Installation and operation
Hide thumbs Also See for SLR (Cosmo):
Table of Contents

Advertisement

5 5

Framing and Clearances

A. Selecting Appliance Location
When selecting a location for the appliance it is important to
consider the required clearances to walls (see Figure 5.1).
WARNING! Risk of Fire or Burns! Provide adequate
clearance around air openings and for service access.
Due to high temperatures, the appliance should be locat-
ed out of traffi c and away from furniture and draperies.
NOTICE: Illustrations refl ect typical installations and are
FOR DESIGN PURPOSES ONLY. Illustrations/diagrams
are not drawn to scale. Actual installation may vary due to
individual design preference.
E
1 IN.
A
Inches
Millimeters
Figure 5.1 Appliance Locations
A
B
C
TOP VENT
0
ONE 90
ELBOW
A
B
53-1/32
48
1347
1218
Heat & Glo • SLR • 2143-900 Rev. D • 12/08
It is important to follow the framing and fi nishing
instructions step by step to ensure proper placement of
fi replace in the surrounding framing/fi nishing materials.
Unlike many traditional, single sided Heat & Glo fi replaces,
the SLR is recessed into surround framing. The left and
right nailing tabs were designed to ensure the fi replace is
recessed to the correct location within the framing materials.
Refer to Section 13 for detailed instructions on fi nishing.
D*
ALCOVE
INSTALLATION
TOP VENT
ONE 90° ELBOW
B
C
D
75
See Section D.
Figure 5.5 & 5.6
1905
F
E
F
19-9/32
17-3/4
490
451
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents