Chase Installations

A. Construct the Chase
A chase is a vertical boxlike structure built to enclose the
fi replace and/or its vent system. Vertical chimneys that
run on the outside of a building must be installed inside a
chase.
Construction of the chase may vary with the type of build-
ing. These instructions are not substitutes for the require-
ments of local building codes. Local building codes MUST
be checked.
A chase should be constructed in the manner of all
outside walls of the home to prevent cold air drafting
problems. The chase should not break the outside build-
ing envelope in any manner. All outer walls need to be
insulated.
Building codes require false ceiling and ceiling fi restops
at each fl oor of the chase or every 10 ft (3.05 m) of clear
space to control spread of fi re.
Walls, ceiling, base plate and cantilever fl oor at the fi rst
level of the chase should be insulated. See Figure 9.1.
Vapor and air infi ltration barriers should be installed in the
chase as per regional codes for the rest of the home. Ad-
ditionally, Hearth & Home Technologies recommends that
the inside surfaces be sheet rocked and taped (or the use
of an equivalent method) for maximum air tightness.
Round Termination Cap
Metal Chase Top
Ceiling
Firestop
False Ceiling
Attic
Insulation
Tabs
Shield
Ceiling
Firestop
Insulation
Insulation
False Ceiling
False Ceiling
Chimney
Figure 9.1
Chase Assembly
32
Insulation in the
outside walls
of the chase
Heat & Glo • BAY-40, PIER-40 • 34977 • Rev W • 11/08
Gas line holes and other openings should be caulked with
high temperature caulk or stuffed with unfaced fi berglass
insulation. If the fi replace is being installed on a cement
slab, we recommend that in cold climates, a sheet of
plywood or other raised platform be placed underneath to
prevent conducting cold up into the room.
Three examples of chase applications are shown in Fig-
ure 9.2.
1. Chimney offset through exterior wall and
enclosed in chase.
2. Chase constructed on roof.
1
Figure 9.2
Chase Constructions
WARNING! You must install false ceilings and ceiling
fi restops at each fl oor of the chase or every 10 ft (3.05 m)
to control spread of fi re.
WARNING! Risk of Fire! DO NOT seal area between fi re
stop opening and chimney pipe. Restricting air fl ow around
chimney may cause fi re.
WARNING! Risk of Fire! You must maintain a minimum
2 in. (51 mm) air space clearance to insulation and other
materials surrounding the chimney system.
Insulation and other materials must be fi rmly secured to
prevent accidental contact with chimney system.
The chase must be properly blocked to prevent blown
insulation or other combustibles from entering and
making contact with fi replace or chimney.
Failure to prevent contact between insulation or other
materials and chimney system may cause overheating
and fi re.