Installation and operation precautions
2.4
Space requirements
To ensure that machine operation, consumables replenishing, part
replacement, and regular maintenance can easily be performed, adhere to
the recommended space requirements detailed below.
190
(7-1/2)
Reminder
Be sure to allow a clearance of 100 mm (4 inch) or more at the back of
this machine for the ventilation duct.
C352P (Phase 3)
1212
341
(47-3/4)
(13-1/2)
C352P+FS-514+PC-403+SD-503+OT-601
437
712
(17-1/4)
(28)
Unit: mm (inch)
2
100
(4)
2-21