Condensate Pipe And Traps; Lighting The Boiler; Checking The Gas Pressure At The Burner - Biasi RIVA COMPACT HE M96.24SM/C User Manual And Installation Instructions

Wall hung, fan flue, room sealed, high efficiency gas boiler
Hide thumbs Also See for RIVA COMPACT HE M96.24SM/C:
Table of Contents

Advertisement

Commissioning
The above operation could save the invalida-
tion of your boilers guarantee and will also pre-
vent problems which you may experience in
the future if an inhibitory is not used.
7.5

Condensate pipe and traps

The full length of the condensate pipe should be
check for leaks.
The boiler has a built--- in condensate trap pro-
vided with a ball valve that prevents the escape of
combustion products when the trap is empty.
It is however recommended that any other trap
in the drain system is correctly filled with water
before to run the boiler.
7.6

Lighting the boiler

Some products incorporate an anti cycling time
delay. It is normal when first switching the boiler on
for the boiler to operate on heating for a few sec-
onds then switch off. After 3--- 4 minutes has
elapsed the boiler will then re ignite and operate
perfectly normally. The ignition delay cycle does
not prevent normal operation of the boiler to pro-
vide d.h.w..
If external controls are fitted (e. g. Timeclock, room
thermostat) ensure they "call for heat".
1 Turn on the electricity supply to the boiler,
switching on the fused spur isolation switch.
The appliance operation light 10 will flash
every 4 seconds.
2 Turn the function selector 8 as in Fig. 7.3
(combi) or Fig. 7.4 (c.h. only). The appliance
operation light 10 will flash every 2 seconds.
10
Fig. 7.3
32
Fig. 7.4
The boiler will now go through an ignition se-
quence and the burner will light.
If during the ignition attempt period the boiler fails
to light, the full sequence control p.c.b. will go to
lockout and the lock--- out signal lamp 6 will ap-
pear.
To reset the boiler press and release the boiler re-
set button 7 (Fig. 7.3).
This boiler has been tested to the highest qual-
ity control standards.
The maximum and minimum gas pressures are
already set during this quality control process
however the checking procedure must be fol-
lowed to ensure maximum operating efficiency
from the boiler.
1 Remove the front panel of the case (see sec-
2 Loosen the internal screw 41 (Fig. 7.5) on the
8
7
6
3 Set the d.h.w. and c.h. temperature control
4 Switch on the boiler and open at least one hot
5 Check the maximum gas pressure and com-
10
7.7
Checking the gas pressure at
the burner
tion 9.2 in this manual).
Outlet Pressure Test Point of the Gas Valve and
connect a pressure gauge using a suitable
hose.
knobs to their maximum position.
water tap fully.
pare the value on the gauge with the value indi-
cated in the sections 4.6 or 4.7 (gas pressures
8
7
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents