Biasi Parva HE M96.24SM/P Service Manual

Biasi Parva HE M96.24SM/P Service Manual

Wall hung, fan flue, room sealed, high efficiency gas boiler
Table of Contents

Advertisement

Wall hung, fan flue, room sealed, high efficiency gas boiler
Service manual
Models:
M96.24SM/P
M96.28SM/P
M96.32SM/P
M96.28SR/P
M96.32SR/P
Leave this manual adjacent to the gas meter
G.C. Appl. No.
47---583---08
47---583---09
47---583---10
41---583---05
41---583---06

Advertisement

Table of Contents
loading

Summary of Contents for Biasi Parva HE M96.24SM/P

  • Page 1 Wall hung, fan flue, room sealed, high efficiency gas boiler Service manual Models: G.C. Appl. No. M96.24SM/P 47---583---08 M96.28SM/P 47---583---09 M96.32SM/P 47---583---10 M96.28SR/P 41---583---05 M96.32SR/P 41---583---06 Leave this manual adjacent to the gas meter...
  • Page 2: Table Of Contents

    Table of contents Modulating gas valve ....11.1 Function ......11.2 Nomenclature of the parts .
  • Page 3: Overall Information

    Overall information Overall View Air pressure Flue thermostat switch Condensing heat exchanger Expansion vessel Main heat exchanger Combustion Safety chamber thermostat Burner Ignition electrodes Detection Automatic electrode air release valve Diverter valve C.h. temp. D.h.w. probe heat exchanger Main circuit flow switch Condensate trap...
  • Page 4: General Access And Emptying Hydraulic Circuits

    General access and emptying hydraulic circuits Nomenclature Fig. 2 To remove the side panels loosen the screws B and C (Fig. 3), bring the base of the panels away from the boiler and lift them, freeing them from the top hooks. Fig.
  • Page 5: Access To The Sealed Chamber

    General access and emptying hydraulic circuits To gain access to the parts contained in the sealed chamber it is necessary to remove the lid of the sealed chamber. For this purpose, remove the front and side panels of the case, remove the screws G as indicated in Fig. 6 and remove the lid.
  • Page 6: Wiring Diagram M96.24Sm

    Diagrams Wiring diagram M96.24SM/... M96.28SM/... M96.32SM/... Electric supply External controls Three way Pump Ignition Primary circuit Air pressure Flame detection terminal block terminal block diverter valve electrodes flow switch switch electrode Condensate trap Remote control D.h.w. flow C.h. temperature Safety Flue D.h.w.
  • Page 7: Wiring Diagram M96.28Sr

    Diagrams Wiring diagram M96.28SR/..., M96.32SR/... Electric supply External controls Pump Ignition Primary circuit Air pressure Flame detection terminal block terminal block electrodes flow switch switch electrode Condensate trap C.h. temperature Safety Flue Modulating probe NTC thermostat temperature gas valve probe NTC bn = brown bu = blue bk = black...
  • Page 8: Functional Flow Diagrams

    Diagrams Functional flow diagrams General layout Electronic control p.c.b. (low voltage section) J1--- 1 Fuse 3,15 A Transformer J3--- 5 J3--- 4 J3--- 3 Three way diverter valve J1--- 2 Pump J3--- 1 J3--- 2 J2--- 5 J2--- 4 Full sequence ignition device Heat request on d.h.w.
  • Page 9: Circuit Voltages

    Diagrams Circuit voltages during c.h. or d.h.w. operation only during c.h. operation Electrical voltages with burner on only during d.h.w. operation Pump 3 way diverter valve Modulating Gas valve Supply network Safety switch thermostat pressure...
  • Page 12: Primary Heat Exchanger

    Primary heat exchanger Function The primary heat exchanger A in Fig. 9 has the function of transferring heat produced from combustion of the gas to the water circulating in it. Fig. 9 Fig. 11 The hydraulic circuit is composed of 8 elliptical pipes Loosen the connection K and move the pipe L connected in parallel (Fig.
  • Page 13: Condensing Heat Exchanger

    Condensing heat exchanger Remove the clip I and move the pipe J down- wards freeing it from the connection, then turn it towards right. Function Using pliers, remove the spring K moving it down- The return water flows through the condensing heat ex- wards and disconnect the rubber pipe L.
  • Page 14: H.w. Heat Exchanger

    D.h.w. heat exchanger Removal Warning: isolate the boiler from the mains Function electricity supply before removing any The d.h.w heat exchanger A in Fig. 14 and Fig. 16 al- covering or component. lows the instantaneous transfer of heat from the primary Remove the front and right hand side panels of hydraulic circuit to the water destined for d.h.w use.
  • Page 15: Pump

    Pump Check that the impeller is integral with the rotor. With the boiler off remove the front and right hand side Function case panels, lower the control panel and empty the pri- mary circuit. The pump A in Fig. 18 and Fig. 19 has the function of Remove the pump head by undoing the screws which making the water in the main circuit circulate through hold it to the pump body and check that the impeller is...
  • Page 16: Three Way Diverter Valve

    Three way diverter valve Function Spindle B not visible The diverter valve A (Fig. 21) has the function of modify- ing the hydraulic circuit of the boiler by means of an electric command given by the electronic control p.c.b. in order to send the water that exits the primary heat ex- changer towards the c.h.
  • Page 17: Removal Of The Diverter Group And Its Internal Parts

    Three way diverter valve Unscrew the screw M and remove the diverter group. Fig. 24 Removal of the diverter group and its internal parts Fig. 26 Rear view of the boiler Refer to the exploded view in Fig. 27 to remove Remove the front and both side case panels.
  • Page 18: Electronic Control/Ignition P.c.b

    Electronic control/ignition p.c.b. The fundamental function of the Electronic control/igni- tion p.c.b. is that of controlling the boiler in relation to the external needs (i.e. heating the dwelling or heating 10.1 Function the water for d.h.w. use) and operating in order to keep the temperature of the hydraulic circuits constant.
  • Page 19: Checking The Temperature

    Electronic control/ignition p.c.b. Some of these devices are directly accessible by the user (function control, temperature adjustment poten- tiometers etc.) others are accessible by removing the service panel or the control panel lid. Fig. 29 x1 connector x6 connector x7 connector x4 connector x2 connector Lock ---out signal lamp...
  • Page 20: Operation Lights

    Electronic control/ignition p.c.b. Boiler in stand --- by condition. (function control in position). Anti--- freeze system active. A short pulse every 4 seconds Boiler ON condition (function control in position) 1 second ON 1 second OFF With the boiler switched ON ( ) all the lamps (10 in Fig.
  • Page 21: Reignition Frequency Setting

    Electronic control/ignition p.c.b. On models M96.28SR/... and M96.32SR/... the knob B is used just for boiler setting and doesn’t affect the 5 1/2 boiler functions during the normal operation. 1 1/2 During the function modes setting, the boiler does not operate.
  • Page 22: Ignition Gas Pressure Adjustment

    Electronic control/ignition p.c.b. To memorize the setting keep pressed the reset Where: Lamp OFF button C for about 5 seconds until the lights E briefly blinks simultaneously. At this point only the Lamp ON right green light flashes. To reset the boiler to the normal operation turn it Fig.
  • Page 23: Checks

    Electronic control/ignition p.c.b. Turn the boiler OFF and ON positioning the func- Fan functioning device tion selector knob A as indicated in Fig. 46 With the boiler operating and the burner on, open the negative pressure test point of the Venturi device. At the moment of opening the burner must turn off.
  • Page 24 Electronic control/ignition p.c.b. While tightening the screws that fix the Electronic Attention control/ignition p.c.b. on the control panel, keep the p.c.b. towards the control panel fascia mak- After installing the Electronic control/ignition p.c.b. : ing sure of the contact between the boiler reset button B and the tab C (Fig.
  • Page 25: Thermal Control In The

    Electronic control/ignition p.c.b. 10.11 Thermal control in the ” ” mode Switch in the function mode See functioning with the function Taking water from the domestic hot control in the mode water circuit? (sec. 10.12) Is primary circuit temperature higher than that selected? Request for heat from room thermostat?
  • Page 26: Ignition And Control Sequence

    Electronic control/ignition p.c.b. 10.13 Ignition and control sequence Ignition request lock memorised? cancels lock Air pressure switch at rest? starts fan Air pressure switch at work? beginning of wait period presence of flame? Air pressure switch at work? starts ignition discharges opens gas valve beginning of ignition period flame presence?
  • Page 27: Modulating Gas Valve

    Modulating gas valve 11.1 Function The Modulating gas valve A in Fig. 53 controls the gas inflow to the boiler burner. Fig. 53 Fig. 54 By means of an electric command given to the on---off operators the passage of the gas through the Modula- 11.3 Adjustment ting gas valve can be opened or closed.
  • Page 28: Checks

    Modulating gas valve Measure the electrical resistance between the connector pins of the on---off operators as illus- trated in Fig. 56. On---off operator approx. 4 180 Ω* * at ambient temperature. Fig. 56 11.5 Removal of the gas valve Warning: isolate the boiler from the mains Fig.
  • Page 29: Primary Circuit Flow Switch

    Primary circuit flow switch 12.1 Function The Primary circuit flow switch (A in Fig. 58) function is Boiler OFF Boiler ON to detect water flowrate through the primary hydraulic Fig. 59 circuit of the boiler. Electrical check It is possible to verify the general operation of the switch by measuring the electric resistance between the con- tacts C.
  • Page 30: Expansion Vessel And

    Primary circuit flow switch Warning: isolate the boiler from the mains electricity supply before removing any covering or component. Remove the front and left hand side panels of the case, turn off the flow and return isolation valves and empty the primary circuit. Completely unscrew the connection K, the lock- nut L (Fig.
  • Page 31: D.h.w. Flow Switch, Filter

    D.h.w. flow switch, filter Sensor 14.1 Function The d.h.w. flow switch A in Fig. 66 is a device that gen- erates an electrical signal when hot water is drawn. Fig. 68 14.3 Checks Warning: isolate the boiler from the mains electricity supply before removing any covering or component.
  • Page 32 D.h.w. flow switch, filter If on the M96.28SM/... and M96.32SM/... model the flow To install the flow limiter: rate of the d.h.w. circuit is too high, it is possible to limit Remove the flow switch group as explained in the it by installing a flow limiter.
  • Page 33: Temperature Probe

    Temperature probe 15.2 Checks Temperature---resistance relationship 15.1 Function The Temperature probe has the function of converting Warning: isolate the boiler from the mains the temperature of the water in the hydraulic circuit electricity supply before removing any where it is installed into an electrical signal (resistance). covering or component.
  • Page 34: Removal

    By---pass valve 16.2 Removal 16.1 Function Warning: isolate the boiler from the mains electricity supply before removing any The By---pass valve A in Fig. 72 is located between the covering or component. c.h. water flow and return and its function is that of guar- anteeing a minimum flow across the primary heat ex- Remove all the case panels.
  • Page 35: Fan, Venturi Device And Air Pressure Switch

    Fan, venturi device and Air pressure switch 17.1 Function The function of the Fan A (Fig. 74 and Fig. 75) is to force the products of combustion through the condensing heat exchanger to the outside air via the flue system. The Fan is supplied by the full sequence ignition device at the beginning of the ignition cycle.
  • Page 36: Removal Of The Fan

    Fan and Air pressure switch Remove the caps of the pressure test points lo- cated on the top of the boiler and connect a differ- ential pressure gauge (Fig. 77). Switch on the boiler. Fig. 78 Remove the Fan by sliding it towards left (se the arrow in Fig.
  • Page 37: Removal Of The Air Pressure Switch

    Fan and Air pressure switch 17.5 Inspect the venturi device B and the connection Removal of the Air pressure switch pipe I. Ensure they are clean. Warning: isolate the boiler from the mains Re---assemble the parts in reverse order of re- electricity supply before removing any moval.
  • Page 38: Ignition And Detection Electrodes

    Ignition and detection electrodes Check the integrity of the detection electrode and ensure that its metallic edge is correctly placed over the ramp of the burner. 18.1 Function Check the connection wires. Three electrodes are fitted on the burner. Two of them are the ignition electrodes and are fitted near the front Warning: isolate the boiler from the mains part of the burner.
  • Page 39: Safety Thermostat

    Safety thermostat contact must be closed (electrical resistance zero Ω). 19.1 Function 19.3 Removal The safety thermostat A in Fig. 84 and Fig. 85 is a de- vice that senses the temperature of the primary circuit Warning: isolate the boiler from the mains water which flows in the outlet pipe of the primary heat electricity supply before removing any exchanger.
  • Page 40: Checks

    Flue temperature probe NTC 20.1 Function The Flue temperature probe NTC A in Fig. 87 and Fig. 88 senses the temperature of the combustion products that flow through the condensing heat ex- changer. Fig. 88 20.2 Checks Overheat temperature value Set the temperature control knobs to their max.
  • Page 41: Condensate Trap

    Condensate trap 21.1 Function The condensate trap A in Fig. 89 and Fig. 91 allows the discharge of the condensate via the condensate drain pipe avoiding in the mean time the escape of combus- tion products. A plastic ball closes the trap outlet in case that the trap is empty.
  • Page 42: Short Spare Parts List

    Short spare parts list Key G.C. part no. Description Q.ty Manufac- Manufacturer’s reference turer part no. Polidoro 173---148 Burner (mod. M96.24SM/...,) KI1004 102 173---149 Burner (mod. M96.28SM/... M96.28SR/... KI1004 147 M96.32SM/... M96.32SR/...) 169---069 Injectors for natural gas (mod. M96.24SM/..., ) KI1064 505 Polidoro Injectors for natural gas...
  • Page 43 Short spare parts list E83---145 Temperature ---pressure gauge BI1475 108 IMIT H07---112 Recuperator BI1262 122...
  • Page 44 *1796214020* 17962.1402.0 2407 44A4 UK Biasi UK Ltd Newman Park, Western Way Wednesbury, WS10 7BJ Sales Tel No: 0121 506 1340 Sales Fax No: 0121 506 1360 Service Tel No: 0121 506 1350 Service Fax No: 0121 506 1370 www.biasi.co.uk...

Table of Contents