8
Packing List
•
Propane Conversion Kit
•
Log Set
•
Touch-Up Paint
•
Batteries (4 AA and 1 9v)
•
Rear Vent Flue Cover
•
Intake Damper Plates (2)
•
Exhaust Restrictor Extender Plate
Installation Overview
See "Vent
Requirements"
See "Gas Line
Installation"
See "Floor
Protection
Requirements"
© Travis Industries
Installation
(for qualified installers only)
Additional Items Required
•
Vent (see "Venting Requirements" for details)
•
Gas Line Equipment (shutoff valve, pipe, etc.)
4091120
See
"Clearances"
100-01239_000