Downflow Conversion - Goodman ADPF Installation & Operating Instructions Manual

Goodman mfg. co. lp. air conditioner user manual
Hide thumbs Also See for ADPF:
Table of Contents

Advertisement

2. After the gas has escaped, remove the nut and discard
the black or brass cap.
3. Remove the check piston to verify it is correct and then
replace the piston. See piston kit chart in instructions.
4. Use a tube cutter to remove the spin closure on the
suction line.
5. Remove the tailpiece clamped to the exterior and slide
the 13/16 nut into place.
6. Braze tailpiece to the line set liquid tube.
PLASTIC or BRASS CAP
13/16" NUT
TAILPIECE
WHITE
TEFLON SEAL
7. Insert the suction line into the connection, slide the in-
sulation and the rubber grommet at least 18" away from
the braze joint. Braze suction line.
8. AFTER THE TAILPIECE HAS COOLED, confirm posi-
tion of the white Teflon
16 nut.
9. Torque the 13/16 nut to 10-25 ft-lbs. or tighten 1/6 turn.
Excessive torque can cause orifices to stick. Use the
proper torque settings when tightening orifices.
10. Replace suction line grommet and insulation.
SUCTION LINE
WITH SPIN CLOSURE

Downflow Conversion

NOTE: ATUF models should not be converted to
Downflow applications.
"D" nomenclature models are factory equipped for "Dedicated
Downflow" operation and no field conversion is required.
Conversion to downflow MUST be performed in an area that
allows access to all sides prior to placing the air handler in its
final location. To prevent the evaporator coil pan from "sweat-
ing" the DPI accessory insulation kit is to be used when per-
forming this conversion. NOTE: The DPI kit is not supplied
with this product and is to be purchased separately. See
Table 7 for the correct DPI kit.
PISTON
Figure 1
®
seal and hand tighten the 13/
RUBBER
GROMMET
Figure 2
ARUF, ATUF
or ARPF Model
1729 / 1824
3030 / 1931 / 3636
3642 / 3743 / 4860 / 4961
Refer to Figures 3 through 5 for the location of the compo-
nents referenced in the following steps. Figure 3 illustrates
the new installation location for the removed components.
1. Before inverting the air handler, remove all access pan-
els, the coil rear channel bracket, and the filter close-off
panel.
2. Remove the evaporator coil and the horizontal drain pan.
Discard horizontal drain pan.
3. Install the provided plastic plug into the vacated access
panel.
4. Remove the two (2) zee coil support brackets and insu-
lation retaining brackets.
5. Remove the tie bracket.
6. Install the DPI Insulation Kit onto the bottom of the drain
pan.
ACCESS
PANEL
NOTE: The filter provision is not applicable
in THIS downflow application.
7. Install the zee coil supports and the wrapper stiffeners.
8. Install the tie bracket.
9. Install the rear channel bracket.
10. To prevent possible condensate "blow off" the insula-
tion retainers are to be laid into the evaporator coil pan
as shown in Figure 4.
7
Insulation Kit
DPI18-30/20
DPI36-42/20
DPI48-61/20
Table 7
RETURN AIR SIDE
OF UNIT
REAR CHANNEL
BRACKET
ZEE COIL
SUPPORT BRACKET
COIL RETAINING
BRACKET
TIE BRACKET
Figure 3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

ArufAspfAtuf

Table of Contents