PRE-ASSEMBLY (English)
NOTE: Two people will be required for this procedure.
NOTE: It is the responsibility of the facility owner/owner of the equipment to ensure that there
is appropriate clearance around each machine to allow for safe use and passage.
1. Read and understand all instructions thoroughly before starting any of
the procedures listed on this instruction sheet.
2. Verify you have received the appropriate confi guration.
A.
Verify you received the appropriate owner's manual.
B.
Verify you received the warranty sheet.
3. Move to desired location.
Cybex MG-525 Owner's Manual
4 - Assembly
Assembly
Page 4-1