Unpack The Premium 50 Kva Ups (With Casters) - Toshiba 4200FA Installation And Operation Manual

Three-phase 15/25/30/50 kva ups
Hide thumbs Also See for 4200FA:
Table of Contents

Advertisement

4.3

Unpack the Premium 50 kVA UPS (with Casters)

(EXCLUDING Seismic and Base models – See Section 4.4)
Carefully inspect the UPS for shipping damage. Units shipped within North America are shrink-
wrapped; those outside North America are crated.
1.
Remove shrink wrap material.
2. Unbolt the rails from both the unit and the shipping pallet.
Place the rails on the front of the pallet.
Use the four 1/2 x 3" bolts to secure the rails to the shipping pallet.
3. Place the tie brackets in the slots at the lower end of the
ramps. SLOWLY roll the unit down the ramp.
4. Save the loading rails for seismic anchoring of the UPS.
DANGER
4200FA Installation and Operation Manual
2
3
TOP HEAVY EQUIPMENT. IMPROPER LIFTING CAN RESULT IN INJURY OR DEATH.
LIFT AND MOVE CAREFULLY AND ONLY WITH ADEQUATE EQUIPMENT AND TRAINED
PERSONNEL. THIS EQUIPMENT WILL TIP OVER EASILY UNTIL FIXED IN PLACE.
13