Product Unpacking / Inspection / Storage / Disposal

4.1

Unpack the Premium 15/25/30 kVA UPS (with Casters)

(EXCLUDING Seismic and Base versions – See 4.2)
Carefully inspect the UPS for shipping damage. Units shipped within North America and NAFTA are
shrink wrapped.
2. Unbolt the rails from both the unit
Place the rails on the front of the pallet.
Use the four 1/2 x 3" bolts to secure the rails to the shipping
pallet.
Attach the rails as shown to the front of the pallet.
3. Place the tie brackets in the slots at the lower end of
the ramps. SLOWLY roll the unit down the ramp.
4. Save the loading rails for seismic anchoring of the UPS. See pg. 14.
DANGER
4200FA Installation and Operation Manual
1. Remove shrink wrap.
and the shipping pallet.
TOP HEAVY EQUIPMENT – DO NOT tilt the UPS more than 10° from the
upright position.
Tilting the UPS more than 10° may cause crushing, trapping, or other
personal injuries and cause physical damage to internal components.
THIS EQUIPMENT WILL TIP OVER EASILY UNTIL FIXED IN PLACE.