Table 6.9 Battery Cabling - 50Kva; Table 6.10 Grounding Cabling - 50Kva - Toshiba 4200FA Installation And Operation Manual

Three-phase 15/25/30/50 kva ups
Hide thumbs Also See for 4200FA:
Table of Contents

Advertisement

Minimum / Maximum Wire Size and Torque requirements
(USE MINIMUM 75 °C INSULATED COPPER WIRING)
Battery (+) / (-)
(+) (-)
Minimum / Maximum Wire Size and Torque requirements
(USE MINIMUM 75 °C INSULATED COPPER WIRING)
Input/ Output (GND)
208-240 VAC
380-480 VAC
600 VAC
30

Table 6.9 Battery Cabling - 50kVA

UPS Battery Input Terminals TB1 50 kVA
AWG*
4/0 – 250 kcmil

Table 6.10 Grounding Cabling - 50kVA

UPS Ground Lugs 50 kVA
AWG
6 – 250 kcmil
6 – 250 kcmil
8 – 250 kcmil
50 kVA
Tightening Torque
200 in-lbs.
50 kVA
Tightening Torque
200 in-lbs.
200 in-lbs.
200 in-lbs.
4200FA Installation and Operation Manual

Advertisement

Table of Contents
loading

Table of Contents