Installing The Cladding - Baxi Bioflo Installation & Servicing Instructions Manual

Pellet central heating system boiler
Table of Contents

Advertisement

For the Installer
2.6

Installing the cladding

The cladding comprises the following parts:
1
8
Fig. 12
Cladding parts
Installation sequence:
– Fit „rear cover" (part 5) at the rear, use 4 nuts to secure to reserve supply container – Fig. 13.
– Connect 4-pin plug of Info panel cable (5-pin plug remains free), secure earth cables for screw to reserve
supply container – Fig. 14.
Fig. 13
Fit rear cover at 4 points
4
2
3
6
5
7
Fig. 14
18
1
Rear left side panel
2
Left side panel
3
Front cover plate
4
Front cover
5
Rear cover
6
Right side panel
7
Rear right side panel
8
Cladding door
Connect 4-pin InfoWIN plug, fit earth cable to
reserve supply container
Info panel plug
Secure earth
cable

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bioflo 12 kw pear

Table of Contents