Baxi Bioflo Installation & Servicing Instructions Manual page 19

Pellet central heating system boiler
Table of Contents

Advertisement

For the Installer
– Screw on the gas springs for BAXI Bioflo with manual filling (Fig. 15)
– Take pressure gauge provided out of ash pan and screw into shut-off valve at front – Fig. 16.
BAXI Bioflo with manual filling
Gas spring
Fig. 15
Screwing on gas springs
– Secure the "left side panel" (part 2) to the boiler at the rear using 3 screws – Fig. 17 and front using 2 screws
– Fig. 18.
Fig. 17
Screwing the side panel on at
the rear at 3 points
– Secure the "front cover plate" (part 3) onto the side panel using 2 screws – Fig. 19
– Secure the "right side panel" (part 6) to the boiler at the rear using 3 screws, at the front using 2 screws and
screw onto the "front cover plate" (part 3) – Fig. 20.
Fig. 19
Screwing the front cover plate on at
the front at 2 points
Fig. 16
Screwing pressure gauge into shut-off valve
Fig. 18
Screwing the side panel on at
the front at 2 points
Fig. 20
Mounting the right side panel in the
same way as the left side panel
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bioflo 12 kw pear

Table of Contents