Installation Siting - Baxi Bioflo Installation & Servicing Instructions Manual

Pellet central heating system boiler
Table of Contents

Advertisement

For the Installer
Fig. 2
BAXI Bioflo in an installation room (more than approx. 15 % of the entire area to be heated)

2.2.3 Installation siting

– The minimum service clearances from flammable materials and for connections, cleaning and maintenance must
be complied with building regualtions part J for full guidance
–– BAXI Bioflo must be placed directly on hearth contstruction - compliant with Part J.
The configuration of the entire system must comply with technical fire protection requirements in accor-
dance with the applicable regulations, standards and guidelines
Wall hinges - fireguard minimum requirments of part J for fire protection safety.
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bioflo 12 kw pear

Table of Contents