Instructions Prior To Installation; Installing The Boiler - Baxi ECO5 BLUE Operating And Installation Instructions

High performance gas-fired wall-mounted boiler
Hide thumbs Also See for ECO5 BLUE:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 21

INSTRUCTIONS PRIOR TO INSTALLATION

This natural draught boiler is intended to be connected only to a flue shared between multiple dwellings in existing buildings that
evacuates the residues of combustion to the outside of the room containing the boiler. It draws the combustion air directly from the
room and incorporates a draught diverter. Due to lower efficiency, any other use of this boiler shall be avoided and would result in
higher energy consumption and higher operating costs.
The following notes and technical instructions are addressed to installers to allow them to carry out trouble-free installation.
Instructions for igniting and using the boiler are contained in the 'Instructions for Users' section. The installation must satisfy the
requirements of local by-laws and technical regulations.
Moreover, the installation technician must be qualified to install heating appliances. Additionally, bear in mind the following:
• This boiler can be connected to any type of double- or single-pipe convector plate, radiator or fancoil unit. Design the system
sections as usual, though, bearing in mind the available capacity-head at the plate (see "SECTION" E at the end of this manual).
• Initial ignition of the boiler must be carried out by the Authorised Service Centre, as indicated on the attached sheet.
ADDITIONAL PUMP WARNING: If an additional pump is used on the heating system, a suitably sized hydraulic separator must
be installed downline from the boiler. This will allow the water pressure switch on the boiler to operate correctly.
SOLAR CIRCUIT WARNING: if the instantaneous (mixed) boiler is connected to a system with solar panels, the maximum
temperature of the domestic hot water entering the boiler must not exceed 60°C.
TEMPERATURE ADJUSTMENT ON LOW TEMPERATURE HEATING SYSTEM: for a low temperature system (such as
underfloor heating), reduce the maximum CH temperature setpoint on the boiler to 45°C) by modifying parameter F06=001 as
described in the SETTING PARAMETERS section.
Failure to observe the above will render the warranty null and void.
Do not leave any packaging (plastic bags, polystyrene, etc.) within the reach of children as they are a potential source of danger.
9.

INSTALLING THE BOILER

The template outline is shown in "SECTION C" at the end of this manual.
After deciding the exact location of the boiler, fix the template to the wall. Connect the system to the gas and water inlets present
on the lower bar of the template. Fit two G3/4 taps (flow and return) on the central heating circuit; these taps make it possible to
carry out important operations on the system without draining it completely. If you are either installing the boiler on an existing
system or replacing one, as well as the above, fit a settling tank under the boiler on the system return line in order to collect any
deposits and scale circulating in the system after flushing.
The boiler has to be directly connected to an efficient chimney which unloads at the outdoor the products of combustion. The
connection section between boiler and flue must be at least the same as the connection boiler section. The chimney always has
to be under good conditions and does not have to have openings or cracks that can determine dispersions of draught.
Tighten the boiler water connections with care (maximum tightening torque 30 Nm).
27
7729106 (02-05/19)

Advertisement

Table of Contents
loading

Table of Contents