Instructions Prior To Installation; Installing The Boiler; Boiler Dimensions And Gas Water Connections - Baxi DUO-TEC Instruction Manual For Users And Fitters

Condensing gas wall-hung boilers
Table of Contents

Advertisement

INSTRUCTIONS PRIOR TO INSTALLATION

lighting and using the boiler are contained in the 'Instructions for Users' section. Installation, servicing and running of domestic
formation of ice in the siphon and in the condensation drain.
• This boiler can be connected to any type of double- or single-pipe convector plate, radiator or thermoconvector. Design the
danger.
• Initial lighting of the boiler must be carried out by an authorised Service Engineer, as indicated on the attached sheet.
ADDITIONAL PUMP WARNING
SOLAR WARNING
entering the boiler must not exceed 60°C.
Do not leave any packaging (plastic bags, polystyrene, etc.) within the reach of children as they are a potential source of danger.

9. INSTALLING THE BOILER

The template outline is shown in annex "SECTION" C at the end of this manual.
Avoid horizontal stretches.
Tighten the boiler water connections with care (maximum tightening torque 30 Nm).

9.1 BOILER DIMENSIONS AND GAS WATER CONNECTIONS

C at the end of the manual.
A
Condensate drain point
B
C
7733595 (01-05/19)
D
GAS inlet
E
F
Heating return
30
"SECTION"

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Compact e

Table of Contents