Genie GCG350L Manual page 18

Includes intellicode remote control and series ii electronics
Table of Contents

Advertisement

5
1. Plug the operator
into a properly grounded
electrical
outlet.
2. Check
Safe-T-Beam®
alignment
(Fig. 6-3).
1. instructions
for electrician.
• Remove power from circuit.
• Remove motor cover (Fig. 6-1).
-Removing
hex head screw located in center
on bottom of cover.
-Slide
cover down and off.
• Remove and throw away existing power cord.
• Remove 7/8" knockout plug (Fig. 6-2).
-install
a suitable entrance bushing.
• Connect permanent
wiring to power head.
- White to white/black
to black / ground to green,
-Use
only UL recognized
wire nuts.
• Wires inside power head must be at least 6"
in length.
• Replace motor cover and re-energize
the circuit.
2. Check
Safe-T-Beam®
alignment
(Fig. 6-3).
NOT_!: _7e OenFe Co£ p_:_ny ;s_no f"espo_,_s/;Ise
m@penden_
eh;_,c_,fc_n,
To correct the problem -- the brackets are
flexible and can be adjusted slightly to bring
the system into alignment.
When the STB's are in alignment the red
LED will stop blinking and stay on.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents