Daikin FTXN09KEVJU Operation Manual page 86

K series split-system room air conditioners
Hide thumbs Also See for FTXN09KEVJU:
Table of Contents

Advertisement

EDUS041111_a
5.
Purging air and checking gas leakage
When piping work is completed, it is necessary to purge the air and check for gas leakage.
WARNING
Do not mix any substance other than the specifi
When refrigerant gas leaks occur, ventilate the room as soon and as much as possible.
R410A, as well as other refrigerants, should always be recovered and never be released directly into the environment.
Use a vacuum pump for R410A exclusively. Using the same vacuum pump for di fferent refrigerants may damage the vacuum
pump or the unit.
• If using additional refrigerant, perform air purging from the refrigerant pipes
and indoor unit using a vacuum pump, then charge additional refrigerant.
Use a hexagonal wrench (3/16 inch (4mm)) to operate the stop valve rod.
All refrigerant pipe joints should be tightened with a torque wrench at the
specifi
ed tightening torque.
1)
Connect projection side of charging hose (which comes from gauge manifold) to gas stop valve's service port.
2)
Fully open gauge manifold's low-pressure valve (Lo) and completely close its high-pressure valve (Hi).
(High-pressure valve subsequently requires no operation.)
3)
Do vacuum pumping and make sure that the compound pressure gauge reads –29.9inHg (–0.1MPa).*1
4)
Close gauge manifold's low-pressure valve (Lo) and stop vacuum pump.
(Keep this state for a few minutes to make sure that the compound pressure gauge pointer does not swing back.)*2
5)
Remove caps from liquid stop valve and gas stop valve.
6)
Turn the liquid stop valve's rod 90 degrees counterclockwise with a hexagonal wrench to open valve.
Close it after 5 seconds, and check for gas leakage.
Using soapy water, check for gas leakage from indoor unit's fl
After the check is complete, wipe all soapy water off.
7)
Disconnect charging hose from gas stop valve's service port, then fully open liquid and gas stop valves.
(Do not attempt to turn valve rod beyond its stop.)
8)
Tighten valve caps and service port caps for the liquid and gas stop valves with a torque wrench at the specified torques.
*1. Pipe length vs. vacuum pump run time
Pipe length
Run time
*2. If the compound pressure gauge pointer swings back, refrigerant may have water content or a loose pipe joint may exists.
Check all pipe joints and retighten nuts as needed, then repeat steps 2) through 4).
Room Air Conditioners K-Series
ed refrigerant (R410A) into the refrigeration cycle.
Up to 49.2ft (15m)
More than 49.2ft (15m)
Not less than 10 min.
Not less than 15 min
Compound
pressure gauge
Gauge
manifold
Low-pressure
valve
Charging
hoses
Vacuum pump
are and outdoor unit's fl
are and valve rods.
Installation Manual
Pressure meter
High-pressure
Liquid
valve
Valve caps
stop
valve
Gas
stop
Service port
valve
85

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents