Figure 3.4.2 Bus Bar Connection Between Main Cabinet And Landing Cabinet (500Kva) - Toshiba G9000 SERIES Installation And Operation Manual

480/480 v 80/100/160/225/300/500/750 kva
Hide thumbs Also See for G9000 SERIES:
Table of Contents

Advertisement

FIGURE 3.4.2 Bus bar connection between main cabinet and landing cabinet (500kVA)

BUS BAR CONNECTION
(TOP VIEW)
ALTERNATE
BUS BAR CONNECTION
(TOP VIEW)
Landing
Main
Cabinet
Cabinet
G9000 Installation and Operation Manual
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents