G9000 SERIES
MMS KIT
INSTALLATION MANUAL
480/ 480 V 1000kVA
Document: 94468-002
Ref.: 4GBH0087 Rev. D
March 2020

Advertisement

Table of Contents
loading

Summary of Contents for Toshiba G9000 Series

  • Page 1 G9000 SERIES MMS KIT INSTALLATION MANUAL 480/ 480 V 1000kVA Document: 94468-002 Ref.: 4GBH0087 Rev. D March 2020...
  • Page 3 UNINTERRUPTIBLE POWER SYSTEM If additional information or technical assistance is required call TOSHIBA Customer Support Center at 877-867-8773, or write to: Toshiba International Corporation, 13131 West Little York Road, Houston, TX 77041-9990 Attn: UPS Product Manager.
  • Page 4 TOSHIBA shall not be liable for technical or editorial omissions or mistakes in this manual. Nor shall it be liable for incidental or consequential damages resulting from the use of information contained in this manual.
  • Page 5: Table Of Contents

    Table 2-1: Parts List of MMS KIT ............................4 Table 3-1: Dip Switch Setting on Parallel Interface Board (IFAU-16*) ................8 Table 3-2: Status of Jumpers on Parallel Interface Board(IFAU-16*) ................9 G9000 Series 1000kVA MMS KIT Installation Manual – 94468-002...
  • Page 6 This Page Left Intentionally Blank G9000 Series 1000kVA MMS KIT Installation Manual – 94468-002...
  • Page 7: How To Use This Manual

    Prohibit: A prohibit symbol shows the act the user or the service personnel should NEVER perform during the UPS installation, operation or service work. PROHIBIT Safety Recommendations: If any problems are encountered while following this manual, contact the Toshiba Customer Support Center. G9000 Series 1000kVA MMS KIT Installation Manual – 94468-002...
  • Page 8: 1.2 Qualified Personnel

    Be trained in the proper care and use of protective equipment such as rubber gloves, hard hat, safety glasses, face shield, flash clothing, etc. in accordance with established practices Be trained in rendering first aid. G9000 Series 1000kVA MMS KIT Installation Manual – 94468-002...
  • Page 9: Overview

    Overview Toshiba G9000 Uninterruptible Power Supply Systems (UPS) need an MMS KIT whenever two or more UPSs are installed in parallel operation configuration. Each UPS requires an MMS KIT installed to allow it to complete the communication circuit with other modules.
  • Page 10: Mms Kit Parts List

    Part No.3, C, 3D, 3E: Wire (Example) Part No.4: Spacer Part No.5: Ferrite Core Part No.6: Dust Cover for LAN Jack Part No.7: Screw(M3), Part No.10:Screw(M4) Figure 3-1: MMS KIT Parts Identification G9000 Series 1000kVA MMS KIT Installation Manual – 94468-002...
  • Page 11: Installation Procedure

    Step 4: Cover the modular connectors with the dust cover. Step 5A: Check location of grounding bus for the next step. Front View of bypass cabinet (with door open) Figure 4-1: Location of IFAU-16* MMS PCB Installation G9000 Series 1000kVA MMS KIT Installation Manual – 94468-002...
  • Page 12: Figure 3-2: Cable Connections Between Ifau-16* And Others

    Check the connector number to verify all cables are plugged in correctly. Step 7: Fasten the cables installed above to the cable clamp with binding band. CN96 Figure 4-2: Cable Connections Between IFAU-16* and Others G9000 Series 1000kVA MMS KIT Installation Manual – 94468-002...
  • Page 13: Figure 3-3: Example Of The Inside Of Bypass Cabinet After Installation

    Do not roll or coil cables as doing so may cause signal interference. Grounding Bus (Door of bypass cabinet) IFAU-16* CSAU-07* (Behind this panel) UPHR-S* Figure 4-3: Example of the Inside of Bypass Cabinet After Installation G9000 Series 1000-2000kVA MMS KIT Installation Manual – 94468-002...
  • Page 14: Figure 3-4: Dip Switch Location On Parallel Interface Board (Ifau-16*)

    UPS#2 ~ UPS#(N-1) UPS#N 1 to 8: ON 1 to 8: OFF 1 and 2: ON (All ON) (All OFF) 3 to 8: OFF Figure 4-5: Example Of Dip Switch Setting G9000 Series 1000kVA MMS KIT Installation Manual – 94468-002...
  • Page 15: Figure 3-6: Location Of Jumpers On Parallel Interface Board(Ifau-16*)

    CN951 TLAIN CN951 TLAIN CN952 TLBIN CN952 TLBIN CN952 TLBIN CN953 TLAOUT CN953 TLAOUT CN953 TLAOUT CN954 TLBOUT CN954 TLBOUT CN954 TLBOUT Figure 4-7: UPS Module Parallel Interface Board (IFAU-16*) Interconnections G9000 Series 1000-2000kVA MMS KIT Installation Manual – 94468-002...
  • Page 16: Figure 3-8: Diagram Of Power Wire Connections (Parallel Operation System Connection)

    (not necessarily the same source as the rectifier inputs). NOTE Figure 4-8: Diagram of Power Wire Connections (Parallel Operation System Connection) G9000 Series 1000-2000kVA MMS KIT Installation Manual – 94468-002...
  • Page 17: Figure 3-9: Diagram Of Power Wire And Control Wire Connection (Parallel Operation System Connection 2X To 8X)

    UPS-1: All ON UPS-2~UPS-(N-1): All OFF UPS-N: ON / S1-1, S1-2 OFF / S1-3 to S1-8 Figure 4-9: Diagram of Power Wire and Control Wire Connection (Parallel Operation System Connection 2x to 8x) G9000 Series 1000-2000kVA MMS KIT Installation Manual – 94468-002...
  • Page 18 This Page Left Intentionally Blank G9000 Series 1000kVA MMS KIT Installation Manual – 94468-002...
  • Page 20 SOCIAL INFRASTRUCTURE SYSTEMS GROUP POWER ELECTRONICS DIVISION 13131 West Little York Rd., Houston, TX 77041 Tel: 855-803-7087 Fax 713-896-5212 US 800/231-1412 Canada 800/872-2192 Mexico 01/800/527-1204 www.toshibaups.com Printed in Japan...