Toshiba R600 S4202 - Portege - Core 2 Duo 1.4 GHz Maintenance Manual page 248

Maintenance manual
Hide thumbs Also See for R600 S4202 - Portege - Core 2 Duo 1.4 GHz:
Table of Contents

Advertisement

4 Replacement Procedures
Installing the Base assembly
To install the base assembly, follow the steps below and refer to Figure 4-7 and Figure 4-8.
1. Set the base assembly to the cover assembly.
2. Secure the base assembly and cover assembly with the following screws.
• M2×4C
• M2×6C
• M2.5×6C
• M2×2.4C
3. Connect the ExpressCard FPC to the connector CN2110 on the system board and
insert the tab under the cover.
4. Set the access cover in place and secure it with the screw.
4-20
[CONFIDENTIAL]
S-THIN HEAD screw
S-THIN HEAD screw
BIND screw
S-THIN HEAD screw
×4 (Described as "A" in the Figure 4-8)
×10 (Described as "B" in the Figure 4-8)
×2 (Described as "C" in the Figure 4-8)
×1 (Described as "D" in the Figure 4-8)
PORTÉGÉ R600 Maintenance Manual (960-709)
4.7 Base assembly

Advertisement

Table of Contents
loading

Table of Contents