Installation - NETGEAR RN12P1210-100NAS - ReadyNAS 3200 RN12P1210 NAS Server Hardware Manual

Readynas rack-mount storage systems
Hide thumbs Also See for RN12P1210-100NAS - ReadyNAS 3200 RN12P1210 NAS Server:
Table of Contents

Advertisement

Installation

Read these instructions in their entirety before you begin. Locate the shipping carton, remove
the rack-mounting kit, and prepare to work with it.
The rack-mounting kit contains two rail assemblies. Each assembly consists of two sections:
An inner fixed chassis rail that secures directly to the unit's chassis.
An outer fixed rack rail that secures directly to the rack itself.
To install the system into a rack:
1.
Extend the rail assembly by pulling it outward.
2.
Press the release tab and separate the inner rail from the outer assembly.
NETGEAR ReadyNAS Rack-Mount Storage Systems
ReadyNAS 3200, 4200 v1, 4200 v2
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents