NETGEAR RN12P1210-100NAS - ReadyNAS 3200 RN12P1210 NAS Server Hardware Manual page 36

Readynas rack-mount storage systems
Hide thumbs Also See for RN12P1210-100NAS - ReadyNAS 3200 RN12P1210 NAS Server:
Table of Contents

Advertisement

NETGEAR ReadyNAS Rack-Mount Storage Systems
3.
Use the provided mounting screws to mount the inner rails to the system chassis, as follows:
a. Fasten the backs of the outer rails to the rack with screws.
b. Press the release to extend the rails.
c. Hang the hooks of the rails into the rack holes, and fasten the rails to the rack.
4.
Attach the chassis to the rack, as follows:
a. Extend the ball shuttle (A) to the very front.
b. Align the rails (B) and push the chassis in.
c. Secure the handles to the outer rails (C) with screws.
The rack-mount installation is complete.
ReadyNAS 3200, 4200 v1, 4200 v2
36

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents