Wiring - Frymaster BIH52 Series Service Manual

Frymaster gas fryer service manual
Hide thumbs Also See for BIH52 Series:
Table of Contents

Advertisement

4.4.5 Wiring

Filter Box Wiring
1
ITEM
PART #
1
806-8021SP 120V U.S. and 100/120V Non-CE Export Upper 9-Pin Plug Assembly
2
806-7494SP 120V U.S. Lower 9-Pin Plug Assembly
3
806-6725SP 230V CE Upper 9-Pin Plug Assembly
4
806-6719SP 100/120V Non-CE Export and 230V CE Lower 9-Pin Plug Assembly
5
810-1062
6
807-2001
*
806-6728SP Pump Motor to Filter Box Wiring Assembly
*
810-0366
*
WIR0287SP 120V U.S. Filter Box Internal Wiring
*
WIR0233SP 100-250V CE and Non-CE Export Filter Box Internal Wiring
* Not illustrated.
1
2
Gas Valve Wiring
ITEM
PART #
1
806-3941SP Harness, Full Vat Gas Valve
2
806-3940SP Harness, Dual Vat Gas Valve
3
806-9678SP Plug Assembly, CE Gas Valve
3
Cable, Filter Box Lower 9-Pin Plug to 807-2001 15-Pin (C2) Connector
Cable, 810-1062 C2 Connector to Filter Terminal Block
Strain Relief 9-pin
2
6
COMPONENT
COMPONENT
4-31
4
5
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mh52 series

Table of Contents