Installing the connection set and collector temperature sensor
Components
Connection set
zP
zQ
zP Connection pipe (short)
zQ Connection pipe (long)
zW Plug
zE Locking ring fitting (angle),
7 22 mm, 90°
Sensor well set
uP
uQ
uP Support sleeve
uQ Locking ring fitting (tee), 7 22 mm
uW Sensor well
Observe the following when installing the
locking ring fitting:
■ All pipes must be cut at right angles
and deburred.
■ Push the union nut and the locking ring
onto the pipe and lightly lubricate the
threads with oil.
■ Push the pipe into the locking ring fit-
ting as far as it will go.
zE
zW
zR Profile clip
zT Support sleeve
zZ Special valve grease
uW
uE
uR
uE Strain relief fitting
uR Thermal insulation
■ Initially turn the union nut by hand,
■
zR
zT
zZ
then tighten with an open-ended span-
ner by a further ¾ turn.
!
Please note
There should be no signs of
damage on the connection
pipes or plugs.
Lubricate O-ring seals only
with the special valve grease
provided.
21