Selecting A Site; Readying The Equipment; Installing The Mounting Rails - HP R3000 User Manual

Hide thumbs Also See for R3000:
Table of Contents

Advertisement

Hex nuts
Cage nuts
Cage nut-fitting tool

Selecting a site

WARNING:
controlled indoor environment, free of conductive contaminants.
When selecting a site, consider the following factors:
Elevated operating ambient temperature—If the equipment is installed in a closed or multi-unit rack
assembly, the operating ambient temperature of the rack environment might be greater than room
ambient temperature. Install the equipment in an environment compatible with the operating
temperature
Reduced air flow—In the rack, the rate of air flow required for safe operation of the equipment must
not be compromised.
Circuit overloading—Consideration should be given to the connection of the equipment to the supply
circuit and the effect that overloading of the circuits might have on overcurrent protection and supply
wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing
this concern.
Reliable earthing—Reliable earthing of rack-mounted equipment should be maintained. Particular
attention should be given to supply connections other than direct connections to the branch circuit,
such as the use of power strips.
Electrical requirements—All models require a dedicated (unshared) branch circuit, suitably rated for
the specific UPS as stated in "Input specifications

Readying the equipment

Check the battery recharge date specified on the label that is affixed to the shipping carton.
1.
IMPORTANT:
battery recharge date label has passed without the battery being recharged, contact an HP
authorized service representative for directions.
Transport the packaged unit to its installation location.
2.
Unpack the equipment near the rack where the unit will be assembled.
3.
CAUTION:
rack. Install the heaviest item first, and continue to populate the rack from the bottom to the
top.

Installing the mounting rails

To prevent fire or electric shock, install the unit in a temperature- and humidity-
("Environmental
specifications" on page 61).
Do not use the battery if the recharge date has passed. If the date on the
Always plan the rack installation so that the heaviest item is on the bottom of the
("UPS input
specifications" on page 59)" .
Installation 14