Hoshizaki KMD-410MAH Instruction Manual page 13

Modular crescent cuber
Hide thumbs Also See for KMD-410MAH:
Table of Contents

Advertisement

6) Route the bin control lead through the hole in the base, then into the bushing provided.
See Fig. 5.
7) While pulling up the bin control
lead, hook the bin control on
the right side interior wall. Then
push the bin control up against
t h e b o t t o m o f t h e u n i t , a n d
slide to the back until it snaps
in place. Make sure the slotted
holes at the right side of the bin
control are securely placed on
the collars at the bottom of the
unit. See Fig. 6.
Make sure the bin control is securely in place. Otherwise, ice may get between gaps
and damage the bin control.
8) Pull up any slack in the bin control lead, then put the bushing attached to the bin
control lead back into the hole in the base.
9) Connect the bin control connector to the side of the control box.
10) Make sure the right and left defl ectors are in their correct positions with the slotted
holes engaged on the collars. Make sure the right and left defl ectors are secured with
the thumbscrews. See Fig. 7.
Bin Control Lead
Fig. 5
NOTICE
12
Bushing
Bin Control
Fig. 6
Collars

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kmd-410mwh

Table of Contents