Extreme Networks 12800 Series Hardware Installation Manual page 78

Blackdiamond 12800 series
Hide thumbs Also See for 12800 Series:
Table of Contents

Advertisement

Installing Power Supply Units
Figure 43: Connecting the Cable to the 1200 W DC PSU
Locking
handle
open
6 Secure the 1200 W DC PSU into the power supply bay by pushing down on the locking handle until
it clicks into place.
NOTE
The DC PSU does not energize until the locking handle latches.
CAUTION
Use caution when routing the cable harnesses to minimize stress on the cables. It is recommended that the left
most cable harness be routed across the switch and exit out the right side of the grate. The right most cable harness
should be routed across the switch and exit out the left side of the grate. It is important to route each of the outer
most cables out the opposite side of installation to maximize the bend radius and to avoid stress on the cables. The
four middle cables can route in either direction.
7 Energize the DC circuit for the 1200 W DC PSU.
To install additional 1200 W DC PSUs, repeat steps 2 through 6.
NOTE
Leave the ESD strap permanently connected to the switch, so that the strap is always available when you need to
handle ESD-sensitive components.
78
Remove/insert
DC plug
Locking handle closed
traps DC plug
BlackDiamond 12800 Series Switches Hardware Installation Guide
Yellow
lever
EX_132

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blackdiamond 12804Blackdiamond 12802

Table of Contents