Installing An Extreme Networks 1200 W Dc Psu - Extreme Networks 12800 Series Hardware Installation Manual

Blackdiamond 12800 series
Hide thumbs Also See for 12800 Series:
Table of Contents

Advertisement

Installing Power Supply Units

Installing an Extreme Networks 1200 W DC PSU

To install an Extreme Networks 1200 W DC PSU:
1 Attach an ESD-preventive wrist strap to your wrist and connect the metal end to the ground
receptacle on the top-left corner of the switch front panel.
CAUTION
Be sure that the grounding point on the back of the switch is securely connected to earth ground. For information
about grounding the switch, see
2 Verify that the 1200 W DC PSU is right side up, and press the yellow locking lever to the left while
lifting the handle (see
NOTE
Do not connect the input DC cable to the DC PSU before inserting the DC PSU into the switch.
Figure 41: Locking Handle on the 1200 W DC PSU
Open
Lock
76
"Grounding the BlackDiamond 12800 Series Chassis" on page
Figure
41).
Yellow
lever
EX_130
BlackDiamond 12800 Series Switches Hardware Installation Guide
68.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blackdiamond 12804Blackdiamond 12802

Table of Contents