General; Installation; Unpacking; Location - Vulcan-Hart MGF24 Installation & Operation Manual

Medium duty gas fryer
Table of Contents

Advertisement

Installation, Operation and Care of
MODEL MGF24 GAS FRYER
PLEASE KEEP THIS MANUAL FOR FUTURE USE

GENERAL

Vulcan fryers are produced with quality workmanship and material. Proper installation, usage and
maintenance of your fryer will result in many years of satisfactory performance.
It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions
provided.

INSTALLATION

The fryer must be restrained with adequate ties to prevent tipping when installed in order to avoid the
splashing of hot liquid.

UNPACKING

This fryer was inspected before leaving the factory. The transportation company assumes full
responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check
for possible shipping damage. If the fryer is found to be damaged, save the packaging material and
contact the carrier within 15 days of delivery.
Carefully unpack fryer and place in a work-accessible area as near to its final installed position as
possible. Remove the packing bag containing the adjustable legs from inside the carton.
Before installing,verify that the electrical service and type of gas supply (natural or propane) agree with
the specifications on the rating plate located on the inside of the front panel. If the supply and
equipment requirements do not agree, do not proceed with the installation. Contact your dealer or
Vulcan-Hart Company immediately.

LOCATION

The equipment area must be kept free and clear of combustible substances. This fryer is for use only
in locations adjacent to non-combustible construction.
— 4 —

Advertisement

Table of Contents
loading

Table of Contents