HEDV SEQUENCE OF OPERATION
0Q
r_
STEP #
--
1)
L;O
2)
3)
4)
5)
6)
7)
s)
9)
lO)
11)
12)
13)
closes
pro_h_g
__
indt_cer
NO
4 Sec
Thermostat calls tbr heat.
Draft Inducer turns on.
Pressure switch closes.
Spark ignition beans.
Gas flow-to burner.
Burner ignition proven.
Circulating Blower on.
Heater bums through heating cycle.
Thermostat satisfied.
Gas flow off to burner.
Draft inducer off:
Circulating Blowers oft:
Heater in stand-by.
val,
gas
f
to bur
i
i1_
__
_3(3 Sec.
18(I Sec
_s
[31oxlei
)w
NOTE:
IF THERE
IS A MALFUNCTION
IN STEPS
3, 5, 6 THE OPERATION
SEQUENCE
WILL
STOPAT
THAT
POINT.
FOR STEPS
5 OR6,
IF AFTER
2 ADDITIONALATTEMPTS
MALFUNCTION
STILL
OCCURS,
THE CON-
TROL
WILL LOCK
OUT FOR ONE HOUR.
FOR PURPOSE
OF TESTING,
THE ONE HOUR
LOCKOUT
CAN BE
OVERRIDDEN
BY RESETTING
TIlE THERMOSTAT
OR INTERRUPTING
THE ELECTRICAL
POWER.