Cisco WS-X6148-GE-TX - Switch Hardware Installation Manual page 88

Ucs 6100 series fabric interconnect
Hide thumbs Also See for WS-X6148-GE-TX - Switch:
Table of Contents

Advertisement

Site Preparation Checklist
S e n d d o c u m e n t c o m m e n t s t o u c s - d o c f e e d b a c k @ c i s c o . c o m
Table C-1
Task No. Planning Activity
1
2
3
4
5
6
1. Verify that the power supply installed in the chassis has a dedicated AC source circuit.
2. UPS = uninterruptible power supply.
Cisco UCS 6100 Series Fabric Interconnect Hardware Installation Guide
C-2
Site Planning Checklist
Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Maintenance access
Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Air flow
Power evaluation:
Input power type
1
Power receptacles
Receptacle proximity to the
equipment
Dedicated circuit for power supply
Dedicated (separate) circuits for
redundant power supplies
2
UPS
for power failures
Grounding evaluation:
Circuit breaker size
CO ground (AC- powered systems)
Cable and interface equipment
evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)
3
EMI
evaluation:
Distance limitations for signaling
Site wiring
4
RFI
levels
Appendix C
Site Planning and Maintenance Records
Verified By
Time
Date
OL-20036-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents