Cisco WS-X6148-GE-TX - Switch Hardware Installation Manual page 53

Ucs 6100 series fabric interconnect
Hide thumbs Also See for WS-X6148-GE-TX - Switch:
Table of Contents

Advertisement

Chapter 2
Installing the Cisco UCS 6100 Series Fabric Interconnect
S e n d d o c u m e n t c o m m e n t s t o u c s - d o c f e e d b a c k @ c i s c o . c o m
Figure 2-11
1 ESD socket (on switch)
3 Grounding cable
5 NRTL listed grounding lug
Warning
When installing or replacing the unit, the ground connection must always be made first and
disconnected last.
Statement 1046
Grounding the chassis is required if you are using DC power supplies, even if the rack is already
Caution
grounded. A grounding pad with two threaded M4 holes is provided on the chassis for attaching a
grounding lug. The ground lug must be NRTL listed. In addition, the copper conductor (wires) must be
used and the copper conductor must comply with NEC code for ampacity.
To attach the grounding lug and cable to the chassis, follow these steps:
Use a wire-stripping tool to remove approximately 0.75 inches (19 mm) of the covering from the end of
Step 1
the grounding cable.
Insert the stripped end of the grounding cable into the open end of the grounding lug.
Step 2
Use the crimping tool to secure the grounding cable in the grounding lug.
Step 3
Remove the adhesive label from the grounding pad on the chassis.
Step 4
OL-20036-02
Grounding the Cisco UCS 6140XP Fabric Interconnect
6
2 ESD plug
4 Screws, M4, with square cone washers
6 Close-up of grounding pad on switch
Cisco UCS 6100 Series Fabric Interconnect Hardware Installation Guide
2
5
4
Grounding the Chassis
1
3
2-19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents