Cisco N5K-M1600 - Expansion Module - 6 Ports Troubleshooting Manual page 159

Troubleshooting guide
Table of Contents

Advertisement

Chapter 9
Troubleshooting Config-Sync Issues
S e n d d o c u m e n t c o m m e n t s t o n e x u s 5 k - d o c f e e d b a c k @ c i s c o . c o m .
Global-db modification in progress
Possible Cause
Verify cannot be performed when global-db is being updated on the local/peer side.
Solution
Wait for the update to complete and run verify.
Peer unable to accept lock request
Possible Cause
Verify cannot be performed when the peer is unable to accept the lock request.
Solution
The peer is handling a transaction and cannot accept a lock request. Run verify at a later time.
Use the show switch-profile status command to determine if there is an ongoing transaction.
If the peer remains in the same state for a long time, use the show cfs lock command to determine if the
CFS fabric has been locked.
Also check the application that has taken the CFS lock. If the application is ssnmgr, use the show cfs
internal session-history name session-mgr command and the show cfs internal notification log name
session-mgr command to view information about when a lock was acquired or released. It can also show
the mapping to the csm transactions displayed with the show switch-profile session-history command.
OL-25300-01
Cisco Nexus 5000 Series Troubleshooting Guide
Verify Failure
9-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents