Rack-Mounting A Summit Switch (Models Other Than Summit X650 Series) - Extreme Networks Summit X250e-24t Hardware Installation Manual

Summit family switches
Hide thumbs Also See for Summit X250e-24t:
Table of Contents

Advertisement

Installing Summit Family Switches
Rack-Mounting a Summit Switch (Models Other than
Summit X650 Series)
This section describes how to install Summit switches in the following series:
Summit X150
Summit X250e
Summit X350
Summit X450
Summit X450a
Summit X450e
To install the switch in a rack, you need the following tools and equipment:
Mounting brackets (provided)
Screws (provided) to secure the mounting brackets to the switch
Eight M3 screws for Summit X350, X450, X450a, and X450e series switches
Twelve M4 screws for Summit X150 and X250e series switches
Four rack mounting screws
The screw size will vary based on your organization's rack system; screws are not provided.
Screwdriver for securing the switch to your organization's rack
The screwdriver size will vary based on the requirements of your organization's rack system.
AC power cord
An AC power cord is not included with the Summit family switch. You must obtain a power supply
cord that meets the requirements listed under
To rack-mount a Summit switch:
1 Place the switch upright on a secure work surface.
2 Place a mounting bracket over the mounting holes on one side of the unit.
3 Insert the screws and fully tighten with a suitable screwdriver, as shown in
Figure 66: Attaching the Mounting Bracket
Summit X350, X450, X450a,
and X450e, series
4 Repeat steps
98
S450_007
2
and
3
for the other side of the switch.
"Selecting Power Supply Cords" on page
33
34
35
36
37
38
39
40
41
42
43
44
5 4
46
47
8 4
45 X
S h a
re d
P o rt
s
Summit X150 and X250e series
Summit Family Switches Hardware Installation Guide
170.
Figure
66.
46 X
47 X
48 X
S o lid
O N
B lin ki
= L in
n g =
k
A ct iv
ity
SH_035b

Advertisement

Table of Contents
loading

Table of Contents