Maintenance - Omron NSH5 - 10-2010 Operation Manual

Hand-held programmable terminal
Hide thumbs Also See for NSH5 - 10-2010:
Table of Contents

Advertisement

Maintenance

5-1
Maintenance
!WARNING
Backing Up Project Data
Keeping a Spare PT
Replacing the Backlight
Replacing the Battery
Note
64
Perform maintenance operations to keep the NSH5-series PT in optimum
condition.
Do not disassemble the PT or touch the inside of the PT while the power is
turned ON. Doing so may result in electrical shock.
Be sure to back up project data and store it in a secure location, in case the
PT should have to be sent out for repairs or be replaced.
It is recommended that a spare PT be kept on hand, in order to enable faster
system recovery in case the original PT should be damaged or the screen
cannot be read due to reaching the end of the backlight service.
If the brightness of the backlight is diminished and the screen becomes diffi-
cult to read, the backlight must be replaced. A backlight cannot be replaced by
the user. If this situation occurs, please contact an OMRON representative.
Ordinarily a backlight would need to be replaced after approximately 75,000
hours at normal temperature and humidity. The service life is shortened in an
extremely cold environment. Replace the backlight if the brightness dimin-
ishes and the screen becomes difficult to read.
Screen data such as calendars, clocks, and log data are backed up by a lith-
ium battery. The battery service life is approximately five years when used in
an environment with a temperature of 25°C. If the temperature at the location
of use is higher than this, the battery life will be shortened. Change the battery
at suitable intervals in accordance with the operating environment.
It is recommended that a spare battery be kept on hand so that the battery
can be quickly replaced when necessary.
Replacement Battery
The replacement battery shown below is a lithium battery for backing up the
memory contents.
Model
CJ1W-BAT01
Replacement battery for the NSH5
Replacement Criteria
Replace the battery under the following conditions.
• When five years have elapsed since a new battery was last installed
• Within five days of when the RUN indicator turns orange
(1) Never use a battery that has been subjected to any strong impact, such
as being dropped on the floor, as the battery may lead fluid.
(2) Before installing a battery, check the battery type and be sure to install it
correctly.
Specifications
Section 5-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nsh5-sqg10b-v2Nsh5-sqr10b-v2Nsh5 series

Table of Contents